Aberdeen. By beginning at Pokfulam, or at both, the desired result could be much more rapidly attained than in any other way.
# A carriage road has been proposed round the Island. If such gradients are adopted, it will meet with the approval of nice drivers and cyclists.
An estimate has been drawn up, and it only remains to call for tenders and enter into contracts to ensure the work of construction being actively pushed forward.
The total length between Pokfulam and Kennedy Town is a little over 18½ miles, which for convenience of working has been divided into three sections, namely Pokfulam to Stanley 7 miles, Stanley to Aberdeen 6 miles, Aberdeen to Kennedy Town 5½ miles. The estimated cost of those sections respectively is $141,020, $95,012, and $145,612.00. Total for the whole road $355,187.00, average of $19,199 per mile.
The shortest section is much more difficult than either of the others, as it runs along the precipitous rock-bound coast at the base of Mount Davis.
Page 186
186
f.
9.
Aberdeen. By beginning at than kiwar
Aberdeen, or at both, die desired
18.
565
or
Lotcu་ e
be much more rapidly attained than in
way
#
any
other time to consider whether a level rond round Mount Davis was worth the expen25.
and then would come the
A carriage road has been threes round the Island it such gradients is will meet with the approval of rice nuvers and cyclists,
fram
eye
an estimate has been.
came fand kilang drawn and it only re- - mains to call for tenders and inter into contracts to ensure the work
construction being retively pushed
f
"The lital length between thanki- -wan and Jennedy Town is a little over 181⁄2 miles, which for convenience of working has been divided into three Actions, namely thankiwan to Stanley 7 miles, flankey 4 Aberdeen be miles, therdeen to Kennedy Town 55 miles. The estimated cost of those sections respec- -tively is $1417020, $95,4012 and $145,612.00 "otal for the whole road $355,187.00 average of $19,199. per mile.
"The shortest section is much more difficult than either of the others, it
along the precipitous rock-bound const at the base of Mount Davis,
4.
ર
involving